|
Concrete Ramp Resurfacing
This new concrete disabled access ramp at a school in London had an unsuitable finish for the clients' needs.
Concrete Renovations were called in to rectify the problem.
- Firstly the surface needed to be scabbled down to a minimum of -6mm to allow for the new material.
- The concrete was then resurfaced using Sikatop 77 a hard wearing, high performance, heavy duty screed.
- A non-slip surface was achieved by drawing a soft brush across the uncured material.
|